EXECUTIVE SUMMARY
Spider Access was awarded the prestigious contract for high-level technical façade rectification, painting works, and access system installation at the DMCC Jewellery and Gemplex Building in Dubai. The project covered an expansive 45,000 square meters of façade surface. Awarded in September 2021, the contract followed a stringent evaluation of Spider Access’s compliance with UAE government safety protocols and technical excellence, confirming our capability to deliver large-scale, high-rise façade projects with precision and professionalism.

SCOPE OF WORK
Spider Access mobilized a team of over 40 IRATA-certified rope access technicians, supported by QA/QC and HSE professionals, to execute the complex façade rehabilitation and finishing scope.
Key works included:
- Comprehensive façade inspection and condition assessment.
- Rectification of structural cracks and render debonding issues.
- Application of a four-coat protective painting system for long-term durability.
- Installation of EN 795-certified anchor points and a Harken Access Rail system for future maintenance.
Each stage of the project was completed with strict adherence to DMCC’s safety and operational standards, ensuring superior quality and minimal disruption to building operations.
CHALLENGES
Delivering the project within an active business environment required precision planning and flexible execution.
Key challenges included:
- Tight deadlines to complete all works during peak Expo 2020 period.
- Fully occupied buildings, requiring noise control and discreet work schedules.
- Complex logistics, including vertical material handling and inventory management.
- Strict aesthetic and quality standards demanded by the client’s design and branding requirements.

OUR SOLUTION
To overcome these challenges, Spider Access implemented a range of targeted solutions:
- Optimized Project Planning: Detailed scheduling and real-time supervision ensured timely completion without compromising safety.
- Discreet Work Execution: Rope access techniques minimized disruption to tenants and visitors.
- Dedicated Logistics Handling: A materials-management specialist maintained stock flow and reduced downtime.
- Quality Assurance Oversight: A Senior QA/QC team continuously monitored surface preparation, mixology, and paint application quality.
Through these measures, Spider Access maintained a seamless workflow while achieving excellent results and exceeding client expectations.
THE TEAM
Our on-site team combined certified expertise and multidisciplinary coordination:
- Project Managers – PMP & NEBOSH-certified professionals ensuring operational excellence.
- HSE Engineers & Officers – NEBOSH / IOSH-certified personnel maintaining full compliance with safety protocols.
- QA/QC Inspectors – IRATA Level 3 & NEBOSH-certified experts monitoring façade standards.
- IRATA-Certified Rope Access Technicians (Levels 1–3) further trained with IPAF & PASMA credentials.
This integrated structure guaranteed safe, efficient, and high-quality delivery.
ACCESS METHODOLOGIES
Rope Access (EN 795 Certified anchor points, HARKEN Access Rail)
CONCLUSION
The DMCC Jewellery and Gemplex Building project demonstrates Spider Access’s capability to manage complex façade rectification and painting works in high-rise, occupied environments. Despite tight deadlines and logistical constraints, our commitment to safety, quality, and innovation ensured timely project completion with outstanding aesthetic and structural outcomes. Through this project, Spider Access reinforced its position as a leading rope access contractor in Dubai, trusted for delivering large-scale façade maintenance, painting, and access system solutions with unmatched safety and precision.