Spider Access was honored with the responsibility of undertaking an array of high-level technical works in the period of 2021-2022. Within this timeframe, Spider Access fearlessly tackled a multitude of scopes that included skillfully applying silicone, meticulously rendering facades, deftly installing glass panels, and orchestrating the placement of over 600 vibrant LED lights and intricate electrical cabling. All of these remarkable feats were accomplished under exceptionally demanding circumstances, where the brave technicians relied on rope access techniques to navigate the challenging terrain and ensure the success of each task.

SCOPE OF WORK

Spider Access effectively managed a workforce of more than 15 highly skilled rope access professionals who were deployed on-site simultaneously. These adept operatives adeptly handled a wide range of demanding tasks, starting from the initial installation of the façade, progressing through the electrical fit-out and glazing processes, and culminating in the crucial stages of leak testing and commissioning.

The scope of work undertaken by Spider Access included various challenging assignments, such as timber battens installation, precise glass installation, meticulous cleaning operations, the installation of façade lights, expert execution of silicone works, and the intricate placement of LED lights.

 

CHALLENGES

Spider Access encountered a multitude of access challenges during the project, primarily stemming from the distinctive architectural designs of the buildings. The unique nature of the structures posed significant obstacles in terms of reaching specific areas for maintenance and installation purposes. The complexity of the designs required innovative solutions to ensure safe and efficient access for the rope access operatives.

OUR SOLUTION

To overcome these access challenges, Spider Access collaborated closely with its sister company to design and install façade access systems. 

 

 

These custom-designed systems provided the necessary support and means for the rope access operatives to navigate the intricate architectural features of the buildings. By strategically placing anchor points and rigging systems, Spider Access ensured safe and controlled access to every nook and cranny of the façade.

During the testing and commissioning phase of the façade, Spider Access exhibited meticulous attention to detail. Their goal was to guarantee that each and every square inch of the façade underwent methodical testing. This exhaustive process aimed to identify any potential issues and ensure the longevity of the intricate designs well into the future. By conducting comprehensive testing, Spider Access secured the durability and functionality of the façade, delivering a high-quality outcome for the project.

 

 

CONCLUSION

Spider Access fearlessly accomplished a multitude of challenging tasks, including silicone application, façade rendering, glass panel installation, and intricate LED light placement. They overcame access challenges through innovative solutions, such as custom-designed façade access systems. Meticulous testing ensured the longevity and functionality of the intricate designs. Spider Access’s expertise and attention to detail delivered a high-quality outcome.